Recherchez un produit
 

Electrical operating

Search 12 sheets ( 11 - 12 )
Simulate a single or tri-phase current load

Simulate a single or tri-phase current load

The 4.5 kilowatts current load simulator aims to load the electrical network to help testing industrial electricity meters during installation.
It helps to reduce the response time of operators.
Check the outer sheath  of buried low or high voltage cables

Check the outer sheath of buried low or high voltage cables

TESTECRAN+™ is used to check the outer sheath of an underground medium or low voltage cable, by measuring the insulation resistance between the screen and earth. If a faulty condition is found, corrective measures must be taken in order to assure ongoing good cable function. It is a handheld device supplied in a carrying case with its earth peg and connecting cables...
< 1 2